How to Build a Water System?



                                               How to Build a Water System?
Cold Water Installation
Installation of Plumbing with Steel Pipes: The galvanized steel pipe must be connected at a sufficient distance to the vineyard. The pipe should be measured and marked. It should then be cut off from the marking area and the pipe mouth cleaned for threading.

Then, the number of the thread that corresponds to the diameter of the pipe should be attached to the thread of the thread. The sheet must be adjusted to the direction of the ratchet and should be attached to the tip of the pipe to be threaded. Vertical pressure must be applied to the axis of the punch and the sheet must be turned clockwise.
The teeth are fixed and the machine oil is dripped on the teeth, so that the paftan is not heated and also a comfortable threading is provided. The tooth size must be as large as 2 teeth.

Direction changes must be made after joining with galvanized steel pipe joint. Never bend, bend and weld these processes, especially hot work.

Otherwise, the galvanized pipe will lose its properties and cause corrosion of the pipe.

Absorbent material must be wrapped on the tooth which is opened absolutely. This material may be a teflon tape or linen. But the best material is self-contained. The Teflon tape is only a silicon based material. Teflon tape should be used especially for materials that are covered with chrome nickel such as extension piece, faucet and valve.

The sealant is attached to the thread of the wrapped tube and tightened. The attachment must not be over-tightened because the attachment can be cracked excessively. Such a situation can be endemic to water leaks. The most important point that should not be forgotten is that the last two fins of the pipe should not be bored. After the pipe joint is cleaned, it should be made aesthetically beautiful.