1 Mart 2017 Çarşamba

How to Build Plumbing

                                                          How to Build Plumbing

The sanitary ware is made with water. The main material is water. We will talk about the paths that are followed when the plumbing is done.
As mentioned at the beginning of our article, the first step is sudur. Water becomes dirty as it functions in the pipes; First of all this dirty water should be thrown out of the building in such a way as not to damage it. The pipes used for supplying clean water are divided into two pipes as internal pipes and feed pipes. Inside the inner plumbing is a subdivision within itself. Now let's give some information about these sections.
Internal Plumbing provides water to the building. It consists of pipes that transport water to the apartments. The laying of the inner pipes is carried out by specialist installers. The pipes should be as short and non-twisted as possible. It is built on invisible places because it is not a pleasant image. A suitable tap is fitted to the tip of the appropriately laid pipes. The quality of interior piping is important for its use. Apart from that, the internal plumbing pipes; Appearance is aesthetic, sweating and noise should not do. Equal distribution to the building; It must be easy to find during meter checks.
Water Counter is the instrument that measures the amount of water consumed. The ends of the water meter are connected by putting the so called materials. To complete the installation, the meter must be fitted with a tap and then a tap. The valve cuts the incoming water when it is necessary. The faucet helps to drain the water after the valve is closed or in case of a possible fault.
The feeding pipe is also known as the outlet line. The pipeline is located between the city water network pipe and the water meter. Generally plastic water pipes are preferred. This pipe is buried in the ground. The pipe extends to the water meter. There are points to pay attention to when laying the supply pipe. For example, attention should be paid to weather conditions (frost, snow etc.) and overloads to be applied from the upper part. You can bury a few meters in the ground for this. Thus, it is protected from weather events and extreme pressure. Since the supply pipes are between the city water and the personal water meter, municipal workers are employed when laying.
Did you have your installation done successfully? To find out this answer, open the taps on the columns and empty the air, wait for at least fifteen minutes after the water is filled in. If there is no leakage, the operation is successful.

Hiç yorum yok:

Yorum Gönder